
342 Ship Calls. 1.6 Million Passengers. One Terminal.
A 1,200-metre quay wall. 11-metre berth depth. Sub-90-minute passenger turnaround. Built for the tonnage that moves economies.
The Numbers That
Close the Deal.
Live data from the 2025 operating year. Every figure independently audited by Lloyd's Register.
Built to Handle
Your Tonnage.
Click any card to reveal full technical specifications. Every stat is certified and auditable.
Dual-Berth Configuration
Accommodates Oasis-class and Icon-class vessels simultaneously. Zero conflict scheduling across 1,200m of continuous quay.
Berthing Specifications
Certified by USCG and ISPS Code compliant.

Passenger Processing Hub
Biometric e-gates, 48 check-in desks, CBP federal inspection facility. Peak throughput of 4,000 passengers per hour.
Terminal Specs
ADA fully compliant. CBP federal inspection facility on-site.

Supply Chain Integration
Cold-chain certified warehousing, bonded stores, and direct rail spur. Full vessel provisioning within 4-hour window.
Logistics Capabilities
ISO 22000 certified food safety management.

Port Operations Platform
Unified PCS (Port Community System) with real-time AIS integration, digital manifest processing, and predictive berth scheduling.
Technology Stack
IMO FAL 5 paperless processing compliant.

Environmental Standards
Shore power on all berths eliminates 98% of at-berth emissions. Zero-liquid-discharge waste reception facility.
Environmental Compliance
EcoPort certification pending Q3 2026.

ISPS Port Facility
USCG-approved Port Facility Security Plan. 24/7 maritime security operations center with K9 units and vehicle screening.
Security Infrastructure
Last USCG inspection: January 2026 — No deficiencies.
The Lines That
Keep Coming Back.
192 active itineraries across 14 cruise lines. Average partnership tenure: 4.7 years.
"Berth's 11-metre draught and dual-gangway capability let us turn Wonder in 81 minutes. No other eastern seaboard port comes close."
"The BerthOS integration with our pre-clearance system cut gangway-to-street time from 34 minutes to 18. Guests notice. They come back."
"LNG bunkering on-berth was the deciding factor. We routed four vessels here specifically because of the environmental compliance infrastructure."
"The shore power infrastructure and zero-liquid-discharge facility helped us hit our 2025 sustainability targets six months early."
Vessel Secured
Mooring lines fast. Shore power connected. Gangways extended within 8 minutes of lines secured.
Gangway Open
CBP officers positioned. Biometric e-gate lanes activated. Priority disembarkation for self-assist guests begins.
Peak Flow
Full passenger throughput achieved. 4,000 pax/hour processing rate. Baggage carousel system active.
Terminal Clear
All 4,000 disembarked passengers cleared customs and exited facility. Vessel ready for embarkation cycle.
4,000 Passengers.
84 Minutes.
Every minute on the quay wall costs a cruise line between $8,000 and $14,000 in fuel, crew overtime, and itinerary compression. Berth's sub-90-minute turnaround eliminates that cost.
Our biometric e-gate system, pre-clearance API integration, and staggered gangway sequencing are the result of 12 years of operational refinement — not theory.
Ready to Route
Your Next Season?
Whether you're evaluating a new itinerary, negotiating a terminal lease, or exploring an expansion partnership — the conversation starts here.
Response within 4 business hours from our Port Relations team
All inquiries handled under NDA on request
Full technical specs package delivered within 24 hours
6-page summary: berth specs, throughput data, ESG credentials, and tariff schedule.
14 cruise lines
currently in active partnership
Request Terminal Specs
Tell us about your operation. We'll send a tailored specs package.